ZJC-100KV電壓擊穿強度試驗儀
一、用途:
First, the use of:
ZJC-100KV電壓擊穿強度試驗儀由電腦控制,數據采集方式通過光電隔離,有效解決試驗過程中的抗干擾問題,軟件操作使用方便,能夠實時顯示動態曲線,同時升壓速率無級可調,可以根據自己的需要進行升壓速率調節,調節范圍在0.1KV-3KV/S,使升壓速率真正做到勻速、準確,并能夠準確測出漏電電流的數據。可實時繪制試驗曲線,顯示試驗數據,判斷準確,并可保存,分析,打印試驗數據。并且能夠自動判別試樣擊穿并采集擊穿電壓數據及泄露電流,同時能夠在擊穿的瞬間電壓迅速降低自動歸零。軟件系統操作方便,性能穩定,安全可靠。
ZJC-100KV by computer control and data acquisition through a photoelectric isolation, effectively solve the problems of anti interference in the process of test, software is easy to operate, can real-time display dynamic curve and rate of pressure rise continuously adjustable, can according to their own needs for boost rate adjustment, the adjustment range in 0.1KV-3KV/S, so that the pressure rate truly uniform, accurate, and can accuray measure the leakage current data. Can draw the test curve in real time, display the test data, judge accuray, and can save, analysis, print the test data. And can automatically determine the sample breakdown and collect breakdown voltage data and leakage current, at the same time can be in the breakdown of the instantaneous voltage quickly reduce automatic zero. Software system is easy to operate, stable performance, safe and reliable.
二、符合標準:
Two, in line with the standard:
1、GB1408.1-2006《絕緣材料電氣強度試驗方法》
1, GB1408.1-2006 "electrical strength of insulating materials test method"
2、GB1408.2-2006《絕緣材料電氣強度試驗方法
2, "GB1408.2-2006 electrical strength of insulating materials test methods
第2部分:對應用直流電壓試驗的附加要求》
Part second: Additional requirements for tests using direct voltage "
3、GB/T1695-2005《硫化橡膠工頻擊穿電壓強度和耐電壓的測定方法》
3, GB/T1695-2005 "vulcanized rubber power frequency breakdown voltage strength and resistance to voltage measurement method"
4、ASTM D149《固體電絕緣材料工業電源頻率下的介電擊穿電壓和介電強度的試驗方法》
4. D149 ASTM test method for dielectric breakdown voltage and dielectric strength of solid electrical insulating material industrial power frequency
三、主要技術要求:
Three, the main technical requirements:
1、設備輸入電壓: 交流 100KV (普通試驗室電源均可兼容)
1, equipment input voltage: AC 100KV (common test room power supply can be compatible)
2、試驗電壓方式: 交流 0--100 KV ;
2, test voltage mode: AC KV 0--100;
直流 0--100 KV;
DC 0--100 KV;
3、電器容量: 10KVA;
3, electric capacity: 10KVA;
4、試驗方法: 0-100KV全量程可調;
4, test methods: 0-100KV full range adjustable;
5、擊穿及耐壓試驗升壓速率:
5, breakdown and pressure test boost rate:
0.1 KV/S
0.1 KV/S
0.2 KV/S
0.2 KV/S
0.5 KV/S
0.5 KV/S
1.5 KV/S
1.5 KV/S
2 KV/S
2 KV/S
2.5 KV/S
2.5 KV/S
3.0 KV/S
3 KV/S
6、試驗方式:
6, test methods:
直流試驗:1、勻速升壓 2、階梯升壓 3、耐壓試驗
DC test: 1, 2, speed boost step-up voltage 3, pressure test
交流試驗:1、勻速升壓 2、階梯升壓 3、耐壓試驗
AC test: 1, 2, speed boost step-up voltage 3, pressure test
注:根據不同行業的標準,我們可以根據用戶的要求,依據貴行業標準,為您定制行業標準所需的特殊測試功能。
Note: according to the standards of different industries, we can according to the requirements of users, according to your industry standards, for your custom industry standards required for the special test function.
7、過電流保護裝置應有足夠靈敏度以保證試樣擊穿時在0.1S內切斷電源。
7, over current protection devices should have sufficient sensitivity to ensure that the sample breakdown in the 0.1S cut off the power supply.
8、漏電電流選擇: 1—100 mA可由計算機軟件自由進行設定。
8, the leakage current selection: 1 - 100 mA can be set free by computer software.
9、本儀器采用*的無觸點原件勻速調壓方式,淘汰同類產品中機械傳動升壓方式。
9, the instrument adopts advanced non-contact original uniform pressure adjustment method, the elimination of similar products in the mechanical transmission boost mode.
10、支持短時間內短路試驗要求。(其它同類產品無此功能)
10, support short time short circuit test request. (other similar products without this feature)
11、一次試驗可以同時做5個試樣。(同類產品一次試驗只能做一個試樣)
11, a test can be done at the same time 5 samples. (similar products can only do one test sample)
12、電壓測量誤差: ≤ 2%
12, voltage measurement error: = 2%
13、試驗電壓連續可調:0-100 KV
13, the test voltage can be adjusted continuously: KV 0-100
14、耐壓時間設定: 0-6小時(可通過軟件連續設定)
14, pressure time: 0-6 hours (set by software continuously set)
15、九級安全防護措施:
15, nine security measures:
(1) 超壓保護
(1) overpressure protection
(2)試驗過流保護
(2) test overcurrent protection
(3)試驗短路保護
(3) test short circuit protection
(4)安全門開啟保護
(4) safety door opening protection
(5)軟件誤操作保護
(5) software protection misoperation
(6)零電壓復位保護
(6) zero voltage reset protection
(7)試驗結束放電保護
(7) test over discharge protection
(8)獨立保護接地
(8) independent grounding protection
(9)試驗完成后電磁放電
(9) after the completion of test electromagnetic discharge
四、試驗方式:
Four, test methods:
1、絕緣試樣空氣中擊穿或耐壓試驗
1, insulation breakdown or pressure test samples in air
2、絕緣試樣浸油中擊穿或耐壓試驗
2, insulation breakdown or compressive specimen immersed in test
3、絕緣試樣空氣中階梯擊穿或耐壓試驗
3, insulation breakdown voltage ladder or samples in air test
4、絕緣試樣浸油中階梯擊穿或耐壓試驗
4, insulation breakdown voltage ladder or specimen immersed in test
五、試驗軟件:
Five, test software:
1、在試驗過程中可對升壓擊穿過程繪制實時曲線,每次試驗的升壓曲線都由不同顏色構成,試驗結束后可疊加對比材料的試驗數據重復性。
, in the test process can boost the breakdown process in real time curve drawing, each test boost curve by different color, after the end of the test can be superimposed contrast material testing data repeatability.
2、可以隨時調取當前及歷史試驗數據進行查看,編輯及修改參數。
2, can at any time to obtain the current and historical test data to view, edit and modify the parameters.
3、試驗過程中可以隨時修改試驗條件及存儲路徑及自動存儲試驗結果。
3, the testing process can modify the test conditions and storage path and automatic storage test results at any time.
4、試驗過程中,可隨時通過軟件決定本次試驗是否有效,方便篩選試驗結果。
4, during the test, may at any time through the software determines the test is effective, convenient screening test results.
5、可設置操作口令,做到專機專人操作,避免無關人員誤操作。
5, set password, do special person operation, to avoid irrelevant personnel misoperation.
六、安全保護功能:
Six, safety protection function:
1、試驗在試驗箱中進行,試驗箱門打開時電源加不到高壓變壓器輸入端,即高壓側無電壓。100KV測試設備高壓電極距離試驗箱壁的zui近距離大于270mm,50KV測試設備高壓電極距離試驗箱壁的zui近距離大于250mm,試驗時即使人接觸箱壁也不會有危險。
, test in the test chamber were, open the door of the box test power does not come to input end of the high voltage transformer, high voltage side voltage free. 100kV test equipment for high voltage electrode distance test chamber wall of the recent distance is more than 270, high-voltage test equipment of high voltage electrode distance test chamber wall of the recent distance greater than 250mm, test even people who come in contact with the wall of the box will not be in danger.
2、設備要安裝單獨的保護地線。接保護地線,主要是減少試樣擊穿時對周圍產生的較強的電磁干擾。也可避免控制計算機失控。
2, equipment to install a separate protective ground. The protective earth wire is mainly to reduce the strong electromagnetic interference generated by the breakdown of the sample. Can also avoid the control of computer control.
3、該試驗設備的電路設有多項保護措施,主要有:過流保護、過壓保護、漏電保護、短路保護、直流試驗放電報警,電磁放電等。
3, the test equipment of the circuit with several kinds of protective measures, mainly has: the overcurrent protection, overvoltage protection, leakage protection, short-circuit protection, DC discharge test alarm, electromagnetic discharge.
4、直流試驗放電報警功能:在設備做完直流試驗時,當開啟試驗門時設備會自動報警,直至使用設備上的放電裝置放電后報警會自動取消.(注:因為直流試驗后不放電會危險到人安全,不能直接拿取電極,起到提醒使用人員放電以免造成傷害)。
4, DC discharge test alarm function: when we finish DC test equipment. When opening the door test equipment will automatically alarm until after using the device discharge device for discharging alarm will automatically be cancelled. (Note: because DC tests on it would be dangerous to people safety to directly take electrode, to remind users discharge so as not to cause harm).
5、試驗放電裝置,電磁鐵自動放電放置。
5, test discharge device, automatic discharge of the electromagnet.
安全事項
Voltage breakdown tester safety matters
器是高壓輸出設備,安裝搬動使用應特別注意人身與設備的安全。請注意以下事項:
The test instrument is a high voltage output equipment, installation and transportation use should pay special attention to personal and equipment safety. Please note the following:
1 設備務必接16A單相220V交流電插座。
1 equipment must be connected to the 16A single phase 220V AC socket.
2 設備兩個接地端子之一務必通過地線導線接配電箱的地線。
2 one of the two grounding terminals must be connected to the distribution box by a dedicated ground wire.
3使用前,設備兩個接地端子之一務必接放電棒。
3 before use, one of the two grounding terminals must be connected to the discharge rod.
4 試驗中,觀察檢測電流如果長時間維持在20-30mA,應立即停止試驗,以免負載過大燒毀保險管。
4 test, the observation of detection current if long maintained at 20-30mA, should immediay stop the test, so as not to load too large burning of the insured.
5 一次試驗完畢,務必先斷掉電源,再用放電棒放掉高壓輸出端的剩余電荷。
5 a test finished, be sure to unplug the residual charge and then put off the high voltage output end of the bar.
6 如遇緊急情況,應立即按壓“急停”按鈕斷電。
6 in case of an emergency, press the "emergency stop" button immediay.
7 長時間不用,斷開所有電源線。
7 long time no, disconnect all power lines.
8 搬運時不能傾斜角過大,以免變壓器油流出。
8 when handling can not tilt angle is too large, so as to avoid transformer oil outflow.
9 換試樣前,確保已經用放電棒放過電,且電源處于斷開狀態。
In 9 samples, make sure you've let the electric discharge rod, and the power is disconnected.
10 測試過程如遇試樣著火,務必先斷電源,后滅火。
10 test process, such as the case of fire, be sure to cut off the power supply, after the fire.